48" Manhole Champions Villiage - Atascocita, TX


1. Project Location:  Champions Villiage HCMUD153, Atascocita, TX

2. Diameter of line, sewer pipe material (RCP, MCIP, brick, etc.), length of rehab portion: 48" manhole, ~6' VF with force main, H2S corrosion

3. When was it constructed and how long has it been in service: Unknown

4. Rehab method used: Danby PL3E flat panels

5. Cleaning method used (if required) and who cleaned the line: Cleaning was performed by Boyer, Inc using 5000 psi water pressure.

6. Method of flow bypass or diversion, if used: None, work was performed in live flow. Flow was turned off at plant for force main work

7. Depth of pipe: N/A.

8. Depth of ground water: N/A.

9. Ventilation and odor control used: N/A.

10. Construction cost (total amount and cost per foot): $23,545. / $3,924 VF

11. Month and year of start-up and end of construction: 12-2016, completed in <30 days

13. Problems encountered after construction: None.

14. Health and safety: Used conventional confined space entry program.

15. Has any re-inspection been performed?  No


Reference:​​​​​​​

Matt Froehlich

Brown & Gay Engineers, Inc.

281-558-8700