Methodology
                    
                        
                            Ventilation and odor control used:
                        
                        
                            Pipe was open at both ends.
                        
                     
                                        
                        
                            Rehab method used:
                        
                        
                            Danby PLIIIE 1” Spiral wound method was used for this rehab to a finished size of 10’-8” x 6’11”
                        
                     
                                        
                        
                            Cleaning method used (if required) and who cleaned the line:
                        
                        
                            Hydro Blast – Pressure washing was used to clean, performed by contractor, Midwest Mole
                        
                     
                                        
                        
                            Method of flow bypass or diversion, if used:
                        
                        
                            Internal bypass in the bottom of the corner was installed as well as Sand bag weir was used to keep the low flow out.