Methodology
Ventilation and odor control used:
Forced air was supplied in the culvert
Rehab method used:
Danby PLIIIE – 1” Modular panels were used to rehab this arch, a leveling ledge was poured to
support the panel on each side. Full annulus grouting with cementitious grout with minimum compressive strength of 6,000 psi.
Cleaning method used (if required) and who cleaned the line:
High pressure (8,000 - 10,000 psi) water blasting performed by Danby installer, Midwest Mole
Method of flow bypass or diversion, if used:
Internal HDPE by-pass pipes were installed in the bottom of the pipe.