48" Manhole Champions Villiage

Project Location
Atascocita, TX
Construction cost
$23,545 / $3,924 VF
Construction Start/End
12/2016 < 30 days

Details

When was it constructed and how long has it been in service:
Unknown
Dimensions:

Diameter of line, sewer pipe material (RCP, MCIP, brick, etc.), length of rehab portion: 48" manhole, ~6' VF with force main, H2S corrosion

Depth of pipe:
N/A
Depth of ground water:
N/A
Health and safety:
Used conventional confined space entry program
Has any re-inspection been performed? What was the condition of the pipe?
No
References

Matt Froehlich
Brown & Gay Engineers, Inc.
281-558-8700

Methodology

Ventilation and odor control used:
N/A
Rehab method used:
Danby PL3E flat panels
Cleaning method used (if required) and who cleaned the line:
Cleaning was performed by Boyer, Inc using 5000 psi water pressure.
Method of flow bypass or diversion, if used:
None, work was performed in live flow. Flow was turned off at plant for force main work.

Hurdles

Problems encountered during construction:
None
Problems encountered after construction:
None