Methodology
Ventilation and odor control used:
Forced Air to supply fresh air
Rehab method used:
A combination of spiral wound and flat panels to accomplish transition in under 20 LF
Cleaning method used (if required) and who cleaned the line:
Hydroblasting + 8000 psi, performed by contractor, Overaa Construction
Method of flow bypass or diversion, if used:
N/A –Plant shutdown due to other work being performed in plant