I-45 and Telephone Rd - Sims Bayou Area, Houston, Texas
Construction cost
$6.5M/~$591 per LF
Construction Start/End
2005 - 09/2006
Details
When was it constructed and how long has it been in service:
Unknown
Dimensions:
Diameter of line, sewer pipe material (RCP, MCIP, brick, etc.), length of rehab portion: 72" & 78" Reinforced Concrete Pipe, 11,000 LF total
Depth of pipe:
17 feet
Depth of ground water:
N/A
Health and safety:
Used conventional confined space entry program
Has any re-inspection been performed? What was the condition of the pipe?
None yet performed
References
City of Houston
Methodology
Ventilation and odor control used:
Forced air into the pipe
Rehab method used:
Danby Panel Lok III-E was spiral wound into the pipe
Cleaning method used (if required) and who cleaned the line:
Mechanical cleaning using buckets and winch for heavy debris removal, then high pressure (6,000 psi) water blasting performed by Danby installer, Boyer, Inc.