Methodology
Ventilation and odor control used:
Forced Air Supplied Ventilation
Rehab method used:
PL3E (1") Flat Panels, with curved corners
Cleaning method used (if required) and who cleaned the line:
High pressure waterblast, preformed by PCI Roads
Method of flow bypass or diversion, if used:
Temporary Bypass - 30,000 GPM