15' x 7.5' Stone Arch Culvert - Columbus, OH
Project Location
Columbus, OH
Construction cost
$600,000
Construction Start/End
06/2011 - 11/2011
Details
When was it constructed and how long has it been in service:
Constructed in 1800's
Dimensions:
Diameter of line, sewer pipe material (RCP, MCIP, brick, etc.), length of rehab portion: 15' Stone Arch Culvert, approx 247 LF
Depth of pipe:
Unknown
Depth of ground water:
Unknown
Health and safety:
Used conventional confined space entry program
Has any re-inspection been performed? What was the condition of the pipe?
Unknown
Methodology
Ventilation and odor control used:
Forced air was supplied in the culvert
Rehab method used:
Danby PLIIIE – 1” Modular panels were used to rehab this arch, a leveling ledge was poured to
support the panel on each side. Full annulus grouting with cementitious grout with minimum compressive strength of 6,000 psi.
Cleaning method used (if required) and who cleaned the line:
High pressure (8,000 - 10,000 psi) water blasting performed by Danby installer, Midwest Mole
Method of flow bypass or diversion, if used:
Internal HDPE by-pass pipes were installed in the bottom of the pipe.
Hurdles
Problems encountered during construction:
None
Problems encountered after construction:
None